Last MVC3 Logic Board Shipped

Last MVC3 Logic Board Shipped

Today we shipped the last MVC3 logic board.

The MVC3 was made obsolete by the MVC4 which began full installation in 2007.  We were able to continue to support the MVC3 for about 10 years following its exit from active production.

Go Back

Waste-to-Energy Upgrades Yield Dramatic Improvements

Ecomaine Controls Upgrade Success Story

When Ecomaine replaced precipitator power controls and rapping controls with new technology from Neundorfer, the intent was to ensure consistent compliance with heavy-metal emission limits, and hopefully save some energy. After installation, the plan ...

Read the White Paper

"A relatively minor capital upgrade had a much larger, positive impact than expected."

Maine Utility

Waste-to-Power Facility